chore(deps): update module github.com/sijms/go-ora/v2 to v2.8.8 #113

Merged
CSRBot merged 1 commits from renovate/github.com-sijms-go-ora-v2-2.x into master 2024-02-14 17:05:42 +00:00
Collaborator

This PR contains the following updates:

Package Type Update Change
github.com/sijms/go-ora/v2 require patch v2.8.7 -> v2.8.8

Release Notes

sijms/go-ora (github.com/sijms/go-ora/v2)

v2.8.8: : new connection break + lob prefetch up to 1 GB

Compare Source


Configuration

πŸ“… Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

β™» Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

πŸ”• Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [github.com/sijms/go-ora/v2](https://github.com/sijms/go-ora) | require | patch | `v2.8.7` -> `v2.8.8` | --- ### Release Notes <details> <summary>sijms/go-ora (github.com/sijms/go-ora/v2)</summary> ### [`v2.8.8`](https://github.com/sijms/go-ora/releases/tag/v2.8.8): : new connection break + lob prefetch up to 1 GB [Compare Source](https://github.com/sijms/go-ora/compare/v2.8.7...v2.8.8) </details> --- ### Configuration πŸ“… **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. β™» **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. πŸ”• **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4xNzMuMSIsInVwZGF0ZWRJblZlciI6IjM3LjE3My4xIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIn0=-->
CSRBot added 1 commit 2024-02-14 17:03:32 +00:00
chore(deps): update module github.com/sijms/go-ora/v2 to v2.8.8
All checks were successful
continuous-integration/drone/pr Build is passing
continuous-integration/drone/push Build is passing
f6fe9bf794
CSRBot scheduled this pull request to auto merge when all checks succeed 2024-02-14 17:03:34 +00:00
CSRBot merged commit f6fe9bf794 into master 2024-02-14 17:05:42 +00:00
Sign in to join this conversation.
No reviewers
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: volker.raschek/db-wait#113
No description provided.