chore(deps): update docker.io/library/golang docker tag to v1.22.5 #44

Merged
CSRBot merged 1 commits from renovate/docker.io-library-golang-1.x into master 2024-07-13 20:01:28 +00:00
Collaborator

This PR contains the following updates:

Package Type Update Change
docker.io/library/golang docker patch 1.22.3 -> 1.22.5
docker.io/library/golang stage patch 1.22.3-alpine3.19 -> 1.22.5-alpine3.19

Configuration

πŸ“… Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

β™» Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

πŸ”• Ignore: Close this PR and you won't be reminded about these updates again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | docker.io/library/golang | docker | patch | `1.22.3` -> `1.22.5` | | docker.io/library/golang | stage | patch | `1.22.3-alpine3.19` -> `1.22.5-alpine3.19` | --- ### Configuration πŸ“… **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. β™» **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. πŸ”• **Ignore**: Close this PR and you won't be reminded about these updates again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4zMjYuMCIsInVwZGF0ZWRJblZlciI6IjM3LjMyNi4wIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbInJlbm92YXRlIiwicmVub3ZhdGUvYXV0b21lcmdlIiwicmVub3ZhdGUvY29udGFpbmVyLWltYWdlIiwicmVub3ZhdGUvZHJvbmVjaSJdfQ==-->
CSRBot added 1 commit 2024-06-04 22:04:55 +00:00
chore(deps): update docker.io/library/golang docker tag to v1.22.4
Some checks reported errors
continuous-integration/drone/push Build was killed
continuous-integration/drone/pr Build was killed
cd60eb917b
CSRBot scheduled this pull request to auto merge when all checks succeed 2024-06-04 22:04:56 +00:00
volker.raschek was assigned by CSRBot 2024-06-06 16:04:49 +00:00
CSRBot changed title from chore(deps): update docker.io/library/golang docker tag to v1.22.4 to chore(deps): update docker.io/library/golang docker tag to v1.22.5 2024-07-13 10:53:49 +00:00
CSRBot force-pushed renovate/docker.io-library-golang-1.x from cd60eb917b to 8deb7b91e2 2024-07-13 10:53:54 +00:00 Compare
Author
Collaborator

Edited/Blocked Notification

Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.

You can manually request rebase by checking the rebase/retry box above.

⚠ Warning: custom changes will be lost.

### Edited/Blocked Notification Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR. You can manually request rebase by checking the rebase/retry box above. ⚠ **Warning**: custom changes will be lost.
CSRBot force-pushed renovate/docker.io-library-golang-1.x from 8deb7b91e2 to dc329229e1 2024-07-13 19:06:40 +00:00 Compare
CSRBot merged commit dc329229e1 into master 2024-07-13 20:01:28 +00:00
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: volker.raschek/dcmerge#44
No description provided.